12-Hour Shift Schedule Template: 14-Day 2-2-3 Rotation

Use a real four-team rotation with daily 06:00–18:00 and 18:00–06:00 coverage. Check the staffing math, download the CSV, or print the table without creating an account.

  • 14-day repeating cycle
  • Four day/night teams
  • Editable CSV
  • Print or save PDF
View the rotation

Editable rotation template

12-hour 2-2-3 rotation

Day numbers are positions in the repeating cycle, not calendar dates. Replace team names and choose a real start date before publishing.

Daily base coverage balances

Cycle

14 days

Teams

4

Coverage represented

168h/week

Average per team

42h/week

DDay shift · 06:00-18:00
NNight shift · 18:00-06:00
OOff
Team1234567891011121314CycleWeekly avg.
Team ADDOODDDOODDOOO84h42h
Team BOODDOOODDOODDD84h42h
Team CNNOONNNOONNOOO84h42h
Team DOONNOOONNOONNN84h42h
CoverageD1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1D1 · N1Required base coverage met each day

This 12-hour shift schedule template covers one continuously staffed position with four alternating teams. One team works the day block, one works the night block, and two are off every cycle day. Each team works seven shifts over 14 days, for 84 cycle hours and a 42-hour weekly average.

That is coverage math, not a complete staffing decision. If a shift needs three people, each team in the table represents a three-person crew. Vacation, sickness, training, breaks, and surge coverage require additional relief capacity.

How to read the 2-2-3 rotation

Team A follows two days on, two off, three on, two off, two on, then three off. Team B fills the opposite day blocks. Teams C and D repeat the same sequence on nights. After day 14, restart at day 1.

The long and short workweeks alternate with the cycle. A manager should attach a real start date before assigning employees, because a weekly total can be 36 or 48 hours even though the 14-day average is 42.

The staffing math behind the table

MeasureCalculationResult
Daily base coverage2 shifts × 12 hours24 hours
Weekly base coverage14 shifts × 12 hours168 hours
One team per cycle7 shifts × 12 hours84 hours
Average per team84 × 7 ÷ 14 days42 hours/week

Multiply 168 weekly hours by the number of people required on duty. Two people on every shift means 336 scheduled person-hours before relief and handoff time.

Keep handoff time visible

The sample blocks touch at 06:00 and 18:00. If the outgoing team must brief the incoming team, inspect equipment, count a drawer, or complete another shared task, add that time to the real schedule. Do not hide a 10- or 15-minute handoff outside paid working time.

Enter the night shift consistently

The table writes the night block as 18:00–06:00 because that is how teams usually read it. The current Maxuod Shift scheduler cannot record that continuous cross-midnight block as one exact shift. Keep the CSV or printed rotation as the source for overnight coverage, or use a documented split that matches your external time record and reconcile the boundary before relying on totals. Do not treat 23:55 as midnight without accounting for the missing five minutes.

Review overtime and night-work limits separately

A 12-hour rotation can cross daily or weekly overtime thresholds depending on the jurisdiction and employee. Use the Canadian overtime calculator as an estimate and review prompt, then verify the dated schedule against current rules, agreements, and payroll advice. The template does not decide whether a particular rotation is appropriate for an employee.

Turn the sample into a real schedule

  1. Choose the real day-one date and name the four crews.
  2. Multiply each team by the required people and roles per shift.
  3. Add relief for leave, absence, training, breaks, and demand spikes.
  4. Document overnight work outside the live total or use a reconciled split convention.
  5. Check each dated week for coverage, availability, hours, and local rules before publishing.

Frequently asked questions

How does this 2-2-3 shift schedule work?
Each team works two 12-hour shifts, has two days off, works three shifts, has two days off, works two shifts, then has three days off. The opposite team fills the open day blocks, while a second pair follows the same pattern on nights.
How many teams does the 12-hour rotation need?
This base example uses four teams: two alternate day coverage and two alternate night coverage. Each team can represent one person or a larger crew. Multiply the team size when each shift needs more than one person on duty.
How many hours does each team work?
Each team works seven 12-hour shifts in the 14-day cycle: 84 cycle hours, averaging 42 hours per week. A calendar week can contain more or fewer than 42 hours depending on where the cycle starts, so review the actual dated week separately.
Can I edit or print this 12-hour template?
Yes. Download the CSV to edit team names, cycle days, and notes in Excel, Numbers, or Google Sheets. Use Print / save PDF for a clean paper or PDF copy of the visible rotation table.
Does this template prove the schedule is safe or compliant?
No. It proves only that the sample day and night blocks are covered. Review actual staffing levels, breaks, handoffs, fatigue, consecutive work, overtime, employee availability, collective agreements, and local employment rules before publishing.

Build the real dated week

Use the free scheduler for the dated roster and same-day blocks. Keep the downloadable rotation as the overnight source until cross-midnight entries are supported exactly.